Construction Formwork /High Ribbed Formwork
High Ribbed Formwork is produced a surface with concrete which will bond directly to the next pour without any special treatment.Producted from hot-dip zinc coated steel sheet to BS 2989 Z2 G275 standards.
High Ribbed Formwork is widely used in buildingconstruction to form retaining walls, columns, stopends, constructionjoints and used to support slab flooring.
Construction Formwork Quality Approval
British CP114 armoured concrete structure standards 1969
British 399 Chapter 1 standards on application of constant load and exerted load 1984 (CP3T Book 5 Chapter 1)
Ribbed Formwork Manufacture:
The mesh and ribs are formed on machines which first cut and press themesh and then roll-form the ribs. At the same time the material isstretched to form an expanded mesh.
Construction Formwork Parameters:
Construction Formwork Specifications |
Model | Thickness (mm) | Weight(kg) | Width(mm) | Length(mm) | Area (m2) |
CF 040 | 0.40 | 3.30 | 450 | 2200 | 0.99 |
CF 045 | 0.45 | 3.70 | 450 | 2200 | 0.99 |
CF 050 | 0.50 | 4.20 | 450 | 2200 | 0.99 |
CF 055 | 0.55 | 4.60 | 450 | 2200 | 0.99 |
CF 060 | 0.60 | 5.00 | 450 | 2200 | 0.99 |